首页> 外文期刊>Gas Today Australia >JEREH GROUP COMPLETES CHINA'S FIRST SHALE GAS LIQUEFACTION PLANT
【24h】

JEREH GROUP COMPLETES CHINA'S FIRST SHALE GAS LIQUEFACTION PLANT

机译:杰瑞集团建成中国首个页岩气液化厂

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

AT ITS CURRENT phase, the plant will produce 2.47 million standard cubic feet per day (MMscf/d) of LNG. The second phase, with capability up to 10.59 MMscf/d. started construction in January 2015 and created 30 direct jobs. The plant is located at Junlian County in Sichuan Province, one of the main shale gas play areas in China, covering an area of 718,000 square feet. In 2014, the shale gas production in Junlian was 3.53 MMcf/'d. Apart from the local demand of 423,800 cf/d, the rest needs to be liquefied for returns on investment. As the project contractor, Jereh offered an integrated solution that includes designing as well as engineering, procurement, and construction management (EPCM).
机译:在目前阶段,该工厂将每天生产247万标准立方英尺(MMscf / d)的液化天然气。第二阶段,能力高达10.59 MMscf / d。 2015年1月开始施工,创造了30个直接工作岗位。该工厂位于四川省Jun连县,这是中国主要的页岩气开采区之一,占地面积718,000平方英尺。 2014年,Jun连页岩气产量为3.53 MMcf / d。除当地需求为423,800 cf / d外,其余的都需要液化以获得投资回报。作为项目承包商,杰雷提供了一个集成解决方案,其中包括设计以及工程,采购和施工管理(EPCM)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号