ZINFRA DELIVER FOR ACTEWAGL IN HUME, ACT

机译:ZACTRA在HUME中交付醋酸

获取原文
获取原文并翻译 | 示例

摘要

THESE NEW FACILITIES will ultimately supply natural gas to approximately 25,000 customers, as well as providing long-term capacity for prospective large consumers, and long-term supply into the Hume-Tuggeranong Interconnection supplying the southern ACT. The Hume Primary Main Extension (PME) Project involved the design, construction and commissioning of 5 km of DN250 steel high-pressure primary gas pipeline, operating to 6.895 MPa, and built and constructed to AS2885.
机译:这些新设施最终将为大约25,000个客户提供天然气,并为潜在的大型消费者提供长期服务,并为向南部ACT供电的Hume-Tuggeranong Interconnection长期提供服务。休ume一次主扩建(PME)项目涉及5 km的DN250钢制高压一次燃气管道的设计,施工和调试,工作压力为6.895 MPa,并按照AS2885进行建造。