首页> 外文期刊>Gas Matters Today >NLNG says Shell's Soku gas plant resumes supply, force majeure remains in place
【24h】

NLNG says Shell's Soku gas plant resumes supply, force majeure remains in place

机译:NLNG说壳牌的Soku天然气厂恢复供应,不可抗力仍然存在

获取原文
获取原文并翻译 | 示例
           

摘要

Nigeria LNG (NLNG) said it has started to receive supplies from Shell’s Soku gas plant in Rivers state, which has been closed for over four months after theives tapped into the plant’s two condensate export pipelines. “Gas production started yesterday and is ramping up quickly. I would say it’s at around 65% capacity now,” a NLNG spokeswoman told reporters. The spokeswoman added that the force majeure was still in place.
机译:尼日利亚液化天然气公司(NLNG)表示,已经开始从壳牌位于里弗斯州的Soku天然气厂接收补给,该公司在该厂的两条冷凝水出口管道中投入了大量资金后已经关闭了四个多月。 “天然气生产昨天开始,并且正在迅速增加。我想说现在的产能约为65%,” NLNG的一位发言人告诉记者。发言人补充说,不可抗力仍然存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号