首页> 外文期刊>Gas Matters Today >Saudi Aramco set to double processing capacity of under-construciton gas plant
【24h】

Saudi Aramco set to double processing capacity of under-construciton gas plant

机译:沙特阿美将建设中的天然气工厂的处理能力提高一倍

获取原文
获取原文并翻译 | 示例

摘要

Saudi Arabian state oil company Saudi Aramco plans to nearly double the processing capacity of its under-construction Fadhili gas plant to 2.5 Bcf/day, it was revealed this week. Located in eastern Saudi Arabia, the Fadhili gas plant, which is due to come online in Q3 2018m, was originally planned to process 1.5 Bcf/d of sour gas from the Khursaniyah and Hasbah fields. Saudi Aramco had initially budgeted USD 1.6 billion for the facility, however this figure was doubled in September.
机译:本周一透露,沙特阿拉伯国家石油公司沙特阿美计划将其在建的法提利天然气厂的处理能力提高近一倍,至每天2.5 Bcf。 Fadhili天然气厂位于沙特阿拉伯东部,原定于2018年第三季度投入使用,最初计划处理来自Khursaniyah和Hasbah气田的1.5 Bcf / d的酸性天然气。沙特阿美公司最初为该设施预算了16亿美元,但这一数字在9月份翻了一番。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号