...
首页> 外文期刊>GeoDrilling International >Bachy Soletanche enables step-free Underground access
【24h】

Bachy Soletanche enables step-free Underground access

机译:Bachy Soletanche可实现无障碍地下通道

获取原文
获取原文并翻译 | 示例
           

摘要

GEOTECHNICAL specialist, Bachy Soletanche Ltd has completed a 1 million pounds piling contract at Shepherd's Bush station, on London Underground's Central Line, involving the construction of two shafts to enable step-free access from platforms. The shafts were built for the redevelopment using the hard/firm secant wall-piling method during a five-month programme of work for infrastructure services firm Morgan Est, the principal contractor. Shepherd's Bush Central Line station is undergoing a major upgrade. It is expected that 60 percent of people visiting the large Westfield London retail and leisure development, which lies to the north of the Shepherd's Bush site, will arrive by public transport. As a result, the project will help the station to accommodate the influx of people. The project involves a number of redevelopments, such as remodelling the ticket hall and the creation of step-free access through the installation of lifts.
机译:土力工程专家Bachy Soletanche Ltd已在伦敦地铁中央线的Shepherd's Bush站完成了一份100万英镑的打桩合同,该工程涉及建造两个竖井,以实现从平台无障碍进出。在主要承包商基础设施服务公司Morgan Est的为期五个月的工作计划中,竖井是使用硬/牢固的割线墙堆砌法进行重建的。牧羊人的布什中央线车站正在进行重大升级。预计将有60%的人参观伦敦西菲尔德大零售和休闲发展区(位于牧羊人布什遗址的北部),将通过公共交通工具到达。结果,该项目将帮助车站适应人们的涌入。该项目涉及许多重建项目,例如改造售票厅,并通过安装电梯创建无障碍通道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号