...
首页> 外文期刊>GeoDrilling International >Geotechnical drilling in Vietnam/Drilling consultant Jervis Sparks reports on the latest activity at the Nui Phao mine site
【24h】

Geotechnical drilling in Vietnam/Drilling consultant Jervis Sparks reports on the latest activity at the Nui Phao mine site

机译:越南的岩土钻探/钻探顾问Jervis Sparks报告了Nui Phao矿区的最新活动

获取原文
获取原文并翻译 | 示例
           

摘要

CANADIAN company Tiberon Minerals'Nui Phao property in northern Vietnam completed its exploration drilling programme in 2003, and this year, on June 25, had completed a 1,500 metre, 22 hole geotechnical programme which will be included in the bankable feasibility study. The two main minerals at Nui Phao are tungsten and fluorspar, with by-products of copper, gold and bismuth. Added to the previous figures, a total of 230 holes have now been drilled at Nui Phao by Tiberon for a grand total of 26,000 m.These include scout, exploration, development, metallurgical and geotechnical holes.This geotechnical programme of drilling and test pitting was to study the soil and rocks which will form the ultimate open pit walls, and this information will be used to design safe slopes.
机译:加拿大公司Tiberon Minerals位于越南北部的Nui Phao矿场于2003年完成了勘探钻探计划,今年6月25日,该公司完成了1,500米,22孔岩土工程计划,该计划将包括在可银行可行性研究中。 Nui Phao的两种主要矿物是钨和萤石,以及铜,金和铋的副产品。除了之前的数据外,Tiberon现在在Nui Phao总共钻了230个孔,总计26,000 m,其中包括侦察,勘探,开发,冶金和岩土工程孔。研究将形成最终露天矿墙的土壤和岩石,并将此信息用于设计安全边坡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号