首页> 外文期刊>Geobulletin >Media monitor
【24h】

Media monitor

机译:媒体监控器

获取原文
获取原文并翻译 | 示例
       

摘要

Ivanplats has begun a revised development study for its Kamoa copper discovery on the Central African Copperbelt in the DRC. The company is proposing two stages of development, with the first phase targeting concentrate production from the high-grade shallow underground resources, and the second entailing a major expansion of the mine and mill, and construction of a large smelter, supported by the full extent of the resources. An updated preliminary economic assessment is expected to be finished in the last quarter of this year, with the full study to be completed in the second half of 2014. Ivanplats executive chairman Robert Friedland said that the revised scenario was aimed at delivering the best balance of a lower initial capital cost and shortest time to first production, while maintaining the company's commitment toward a major mine, mill, and smelting operation.
机译:Ivanplats已针对其在刚果民主共和国中部非洲铜矿带上的Kamoa铜矿发现进行了修订后的开发研究。该公司提出了两个发展阶段,第一阶段的目标是从高品位的浅层地下资源中进行精矿生产,第二阶段的目标是对矿山和工厂进行大规模扩建,并在全力支持下建设大型冶炼厂资源。最新的初步经济评估预计将在今年的最后一个季度完成,而全面研究将在2014年下半年完成。Ivanplats执行主席罗伯特·弗里德兰德(Robert Friedland)表示,修订后的方案旨在实现最佳平衡。较低的初始资金成本和最短的首次生产时间,同时保持了公司对大型矿山,冶炼厂和冶炼厂的承诺。

著录项

  • 来源
    《Geobulletin》 |2013年第3期|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 地质学;
  • 关键词

  • 入库时间 2022-08-18 11:06:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号