首页> 外文期刊>European Journal of Operational Research >A new insertion-based construction heuristic for solving the pickup and delivery problem with time windows
【24h】

A new insertion-based construction heuristic for solving the pickup and delivery problem with time windows

机译:一种新的基于插入的构造试探法,用于解决带有时间窗的取件和交付问题

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper we present a new insertion-based construction heuristic to solve the multi-vehicle pickup and delivery problem with time windows. The new heuristic does not only consider the classical incremental distance measure in the insertion evaluation criteria but also the cost of reducing the time window slack due to the insertion. We also present a non-standard measure, crossing length percentage, in the insertion evaluation criteria to quantify the visual attractiveness of the solution. We compared our heuristic with a sequential and a parallel insertion heuristic on different benchmarking problems, and the computational results show that the proposed heuristic performs better with respect to both the standard and non-standard measures. (c) 2005 Elsevier B.V. All rights reserved.
机译:在本文中,我们提出了一种新的基于插入的构造启发式方法,以解决带有时间窗的多车辆取货和交付问题。新的启发式方法不仅在插入评估标准中考虑了经典的增量距离度量,而且还减少了由于插入而导致的时间窗口松弛的成本。我们还在插入评估标准中提出了一种非标准方法,即交叉长度百分比,以量化溶液的视觉吸引力。我们将启发式方法与针对不同基准测试问题的顺序插入式和并行插入式启发式方法进行了比较,计算结果表明,相对于标准和非标准度量,所提出的启发式方法性能更好。 (c)2005 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号