首页> 外文期刊>European Journal of Operational Research >Managing uncertainty in major equipment procurement in engineering projects
【24h】

Managing uncertainty in major equipment procurement in engineering projects

机译:管理工程项目主要设备采购中的不确定性

获取原文
获取原文并翻译 | 示例
           

摘要

A better management of time uncertainty in major equipment procurement in engineering construction projects can significantly contribute to project performance. A survey study shows that time buffer is a popularly used approach to protect project schedule from activity duration variation and uncertainty. The problem is that there are repetitive time allowances inserted in the procurement supply chain process and these time buffers are used ineffectively, thus leading to considerable time wastage. Relevant lessons from supply chain management and critical chain project management are combined and applied to create an enhanced critical supply chain management model for major equipment procurement to achieve better management of time uncertainty. This model does not perceive uncertainty purely as a threat, but also as an opportunity to reduce procurement cycle times. (c) 2004 Elsevier B.V. All rights reserved.
机译:对工程建设项目主要设备采购中的时间不确定性进行更好的管理可以显着提高项目绩效。一项调查研究表明,时间缓冲是一种流行的方法,可以防止项目进度受到活动持续时间的变化和不确定性的影响。问题在于,在采购供应链流程中插入了重复的时间津贴,这些时间缓冲器的使用效率不高,从而导致大量的时间浪费。将来自供应链管理和关键链项目管理的相关经验相结合,并应用于为主要设备采购创建增强的关键供应链管理模型,以更好地管理时间不确定性。该模型不仅将不确定性视为威胁,而且还减少了采购周期。 (c)2004 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号