...
首页> 外文期刊>European Journal of Operational Research >Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems
【24h】

Parallel computing applied to the stochastic dynamic programming for long term operation planning of hydrothermal power systems

机译:并行计算在随机动态规划中用于水火发电系统的长期运行规划

获取原文
获取原文并翻译 | 示例

摘要

In this paper, parallel processing techniques are employed to improve the performance of the stochastic dynamic programming applied to the long term operation planning of electrical power system. The hydroelectric plants are grouped into energy equivalent reservoirs and the expected cost functions are modeled by a piecewise linear approximation, by means of the Convex Hull algorithm. In order to validate the proposed methodology, data from the Brazilian electrical power system is utilized.
机译:本文采用并行处理技术来提高随机动态规划在电力系统长期运行规划中的性能。将水力发电厂分组为等效的水库,并借助凸壳算法通过分段线性逼近对预期成本函数进行建模。为了验证所提出的方法,利用了来自巴西电力系统的数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号