...
首页> 外文期刊>European Journal of Operational Research >Project selection, scheduling and resource allocation with time dependent returns
【24h】

Project selection, scheduling and resource allocation with time dependent returns

机译:项目选择,日程安排和资源分配以及与时间有关的回报

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper we formulate and analyze the joint problem of project selection and task scheduling. We study the situation where a manager has many alternative projects to pursue such as developing new product platforms or technologies, incremental product upgrades, or continuing education of human resources. Project return is assumed to be a known function of project completion time. Resources are limited and renewable. The objective is to maximize present worth of profit. A general mathematical formulation that can address several versions of the problem is presented. An implicit enumeration procedure is then developed and tested to provide good solutions based on project ordering and a prioritization rule for resource allocation. The algorithm uses an imbedded module for solving the resource-con strained project scheduling problem at each stage. The importance of integrating the impact of resource constraints into the selection of projects is demonstrated. (C) 2007 Elsevier B.V. All rights reserved.
机译:在本文中,我们制定并分析了项目选择和任务调度的联合问题。我们研究了经理有许多其他项目需要追求的情况,例如开发新产品平台或技术,增量产品升级或持续的人力资源培训。假定项目回报是项目完成时间的已知函数。资源有限且可再生。目的是使当前的利润最大化。提出了可以解决该问题的多个版本的通用数学公式。然后,开发并测试隐式枚举过程,以基于项目排序和资源分配的优先规则提供良好的解决方案。该算法在每个阶段使用嵌入式模块来解决资源紧张的项目调度问题。说明了将资源约束的影响整合到项目选择中的重要性。 (C)2007 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号