An air separation plant (ASU) with a nominal capacity of 40,000 Nm7h of oxygen has been successfully commissioned in Shouguang city of Shandong province, China recently. Built for Shandong Molong Petroleum Machinery Co Ltd by Hangzhou Fortune Engineering Co. Ltd, the plant achieved all the required technical parameters as specified in the contract.
展开▼