...
首页> 外文期刊>Gasworld Magazine >Hydrogen infrastructure behind schedule in Japan
【24h】

Hydrogen infrastructure behind schedule in Japan

机译:日本氢能基础设施落后

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

According to The Gas Review, only 36 commercial hydrogen stations had been opened in Japan at the end of January, despite originally indicating the figure would stand at 81. Because of these delayed openings, stations were expected to rapidly open one after the other towards the end of 2015, but the initial target of 100 stations last year could not be met and subsequently dropped to 81, with the decision to set up the remaining 19 stations later this year.
机译:据《天然气评论》(Gas Review)报道,尽管最初表明该数字为81个,但截至1月底,日本仅有36个商业加氢站开放。由于这些开放时间的延迟,预计加氢站将一个接一个地快速打开。到2015年年底,但去年的最初目标100个电台未能实现,随后又降至81个,并于今年晚些时候决定建立其余19个电视台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号