首页> 外文期刊>Gasification News >Duke Cites Higher Labor Costs in Edwardsport IGCC Project Update to IURC
【24h】

Duke Cites Higher Labor Costs in Edwardsport IGCC Project Update to IURC

机译:杜克在Edwardsport IGCC项目更新到IURC中引用了更高的人工成本

获取原文
获取原文并翻译 | 示例
           

摘要

Duke Energy on June 27 told Indiana Utility Regulatory Commission (IURC) that labor productivity costs on its Edwardsport, Indiana, integrated gasification combined cycle (IGCC) project have risen by just over US$100 million, but the company may find ways to offset those extra costs. Poor weather, delays in material deliveries and other factors can affect labor productivity, the company explained in its semi-annual report to IURC.
机译:杜克能源公司(Duke Energy)在6月27日告诉印第安纳州公用事业监管委员会(IURC),其印第安纳州爱德华兹波特综合气化联合循环(IGCC)项目的劳动生产率成本仅增加了1亿多美元,但该公司可能会找到办法抵消这些额外费用费用。该公司在提交给IURC的半年度报告中解释说,恶劣的天气,材料交付的延误以及其他因素会影响劳动生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号