首页> 外文期刊>Eurowire >Forty years of continuous casting
【24h】

Forty years of continuous casting

机译:连续铸造四十年

获取原文
获取原文并翻译 | 示例
           

摘要

Upcast~R continuous upward casting is forty years old. The Upcast story began in the late 1960s, when casting directions were typically downward or horizontal; cast products were large in cross-section and required further processing in numerous downstream steps. At Outokumpu's Pori (Finland) plant, research began into casting rod or tube that was closer to the size of the final product. The initial development work culminated in 1968 with the first successful upward test casting. Two years later the first production line was installed at the Pori foundry. The second line, commissioned for an outside customer for copper alloys, followed a year later.
机译:Upcast〜R连续向上铸造已有40年的历史。 Upcast的故事始于1960年代后期,当时铸造方向通常是向下或水平。铸件横截面很大,需要在许多下游步骤中进行进一步处理。在奥托昆普的Pori(芬兰)工厂,开始研究更接近最终产品尺寸的铸棒或铸管。最初的开发工作在1968年达到成功,并首次成功进行了向上试铸。两年后,Pori铸造厂安装了第一条生产线。一年后,第二条生产线委托给外部客户使用铜合金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号