首页> 外文期刊>European Offshore Petroleum Newsletter >Northern Ireland gas storage test well
【24h】

Northern Ireland gas storage test well

机译:北爱尔兰储气测试井

获取原文
获取原文并翻译 | 示例
       

摘要

InfraStrata has started drilling operations at the Mandmagee-1 well in Northern Ireland. Drilling operations are expected to take around five weeks. The well will be drilled to a total drilled depth of approximately 1,700m (5,578ft). "The objective of the well is to confirm the feasibility of the development of an underground gas storage facility in salt caverns, by obtaining wireline data and core samples of the Permian salt to undertake laboratory analyses, including rock mechanical tests, to further define the design parameters and cost estimate for the project," InfraStrata said.
机译:InfraStrata已开始在北爱尔兰的Mandmagee-1井进行钻井作业。钻井作业预计需要大约五个星期。该井将被钻探到大约1,700m(5,578ft)的总深度。 “该井的目的是通过获取电缆数据和二叠纪盐岩的岩心样本进行实验室分析,包括岩石力学测试,从而进一步确定设计,从而确定在盐洞中开发地下气体储存设施的可行性。参数和项目的成本估算,” InfraStrata说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号