Statoil has opted to cancel the contract with the Songa Trym rig four months before the deal is due to expire on 4 March 2016. Statoil has previously notified Songa Offshore that the rig would be suspended for a period, and Statoil has tried to find other assignments for the rig after the suspension period and up to the expiration of contract.
展开▼