【24h】

Bridge fires up UK Duart

机译:桥开火了英国Duart

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Bridge Energy has re-started production from the Duart field in the UK North Sea.The field, in Block 14/20, has been shut in since October last year as a result of planned maintenance activity on the host Tartan platform.Bridge said: "The extended shutdown on the Tartan platform has enabled completion of a more comprehensive maintenance work scope which should increase the near term uptime of the facility."The anticipated increase in host uptime and a period of flush production following the long shut down, will partially offset the delayed Duart production volumes, but over-all 2012 revenues from Duart are expected to be higher because of the increased oil price."
机译:Bridge Energy已从英国北海的Duart油田重新开始生产.14 / 20区块的该油田自去年10月以来已关闭,原因是计划在主机Tartan平台上进行维护活动。 “在Tartan平台上延长的停机时间使完成更全面的维护工作范围成为可能,这将增加设备的近期正常运行时间。”预期的主机正常运行时间的增加和长时间停机后的冲洗生产时间将部分抵消了Duart产量的延迟,但由于油价上涨,预计2012年Duart的总收入将更高。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号