...
【24h】

UK Stella well test

机译:英国斯特拉油井测试

获取原文
获取原文并翻译 | 示例

摘要

Ithaca Energy has completed flow test operations on the fifth and final development well oh the Stella field offshore the UK -with the well achieving a flow rate of more than 8,000 boe/d. Well 30/6a-A3Y (A3) is the fifth development well drilled on the Stella field. The well was drilled to a total measured depth subsea of 4,348m (14,267ft), with a 651m (2,137ft) gross horizontal reservoir section completed in the Ekofisk chalk reservoir, the secondary reservoir underlying the primary Stella Andrew sandstone formation in which the first four Stella wells have been drilled. The Ekofisk well intersected a net reservoir interval of 632m (2,073ft), equating to 97% net pay.
机译:Ithaca Energy已完成了英国海上Stella油田的第五口也是最后一口开发井的流量测试操作,该井的流量超过了8,000 boe / d。 30 / 6a-A3Y井(A3)是在斯特拉油田钻的第五口开发井。该井钻至总测得的海底深度4,348m(14,267ft),在Ekofisk白垩储层中完成了651m(2,137ft)的水平总储层段,次储层位于斯特拉·安德鲁主要砂岩地层的下方,其中第一已钻了四个Stella井。 Ekofisk井与632m(2,073ft)的净储层间隔相交,相当于净收益的97%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号