首页> 外文期刊>Bulletin of the Seismological Society of America >On the Use of Multiple-Site Estimations in Probabilistic Seismic-Hazard Assessment
【24h】

On the Use of Multiple-Site Estimations in Probabilistic Seismic-Hazard Assessment

机译:关于多站点估计在概率地震危险性评估中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

We analyze specific features of multiple-site (MS) probabilistic seismichazard assessment (PSHA), that is, the annual rate of ground-motion level exceedance in at least one of several sites of interest located within a defined area or along a linear extended object. The relation between MS hazard estimates and strong ground motion data obtained during large earthquakes is discussed in the cases of the 1999 Chi-Chi M-w 7.6 and the 2008 Wenchuan M-w 7.9 earthquakes. The strong-motion records obtained in the epicentral zones may be considered as examples of the ground motion exceeding the design level estimated using the conventional pointwise (PW) PSHA. We show that the MS-PSHA, when being performed for the 475 yr standard return period, provides reasonable estimations of the intensity level that may occur during the earthquakes, parameters of which are close to the parameters of events with maximum possible magnitude accepted in PSHA for the regions. The MS-PSHA efficiency is discussed with respect to (1) evaluation of the performance of probabilistic seismichazard maps and (2) application of the MS hazard estimates as a basis for design loads. Based on the results of this work, we propose a multilevel approach to PSHA considering the fixed reference probability of exceedance (e.g., 10% in 50 yrs): (1) a standard PW-PSHA, to be performed in a seismic-prone region (first level), and (2) this analysis should be supplemented by an MS-PSHA for urban and industrial areas or for zones of a particular economic and social importance (second level).
机译:我们分析了多站点(MS)概率地震危险性评估(PSHA)的特定特征,即位于定义区域内或沿线性扩展对象的多个感兴趣站点中的至少一个的年地面运动水平超出率。在1999年的Chi-Chi M-w 7.6和2008年的汶川M-w 7.9地震中,讨论了MS危险估计与大地震中获得的强地面运动数据之间的关系。在震中区域获得的强运动记录可以被视为超过使用常规逐点(PW)PSHA估算的设计水平的地面运动的示例。我们显示,MS-PSHA在475年的标准回归期中执行时,提供了地震期间可能发生的强度水平的合理估计,其参数与PSHA接受的最大可能震级的事件参数接近对于地区。在以下方面讨论了MS-PSHA的效率:(1)评估概率地震灾害图的性能;(2)应用MS灾害估计作为设计载荷的基础。基于这项工作的结果,我们提出了一种考虑固定参考超出概率(例如,在50年内为10%)的PSHA多层次方法:(1)在地震多发地区执行的标准PW-PSHA (第一级),以及(2)对于城市和工业区或具有特定经济和社会重要性的区域(第二级),应在MS-PSHA的基础上进行补充。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号