首页> 外文期刊>Equipment today >TECHNOLOGY HELPS BUILD SCHOOL 50% Faster and Four Months Early
【24h】

TECHNOLOGY HELPS BUILD SCHOOL 50% Faster and Four Months Early

机译:科技使建校速度加快50%,提前四个月

获取原文
获取原文并翻译 | 示例
       

摘要

Big Dipper Construction is able to substantially cut both time and costs on the project. In early 2015, Big Dipper Construction Inc. (BDC), Wasilla, AK, won a bid to build the Joe Redington Sr. Junior-Senior High School in Alaska's Mat-Su Valley. The scope of work included clearing 26 acres of land, moving 300,000 cu. yds. of dirt, site prep before setting the footings and grading. The company also won the bid to run all of the underground utilities outside the building, as well as excavation for the interior utilities and electrical.
机译:北斗七星建筑能够大幅削减该项目的时间和成本。 2015年初,北卡罗来纳州瓦西拉的北斗七星建筑公司(BDC)赢得了在阿拉斯加Mat-Su山谷建造乔·雷丁顿高级初中的竞标。工作范围包括清理26英亩土地,运送300,000立方米。 yds。污垢,在设置基础和分级之前进行现场准备。该公司还赢得了在建筑物外运营所有地下公用事业以及为内部公用事业和电气设备进行挖掘的竞标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号