首页> 外文期刊>Equipment today >Pipe Bursting at Low Tide: Idyllic island beach front is still blemish-free after storm sewer upgrade
【24h】

Pipe Bursting at Low Tide: Idyllic island beach front is still blemish-free after storm sewer upgrade

机译:退潮时的管道爆裂:下水道升级后,田园诗般的小岛海滨仍无瑕疵

获取原文
获取原文并翻译 | 示例
           

摘要

When periodic maintenance could no longer keep the storm sewer system of Biscayne Island at full functionality, the Miami Office of Capital Improvements & Transportation Program scheduled the vitrified clay and concrete pipes for replacement. Though the system could still handle most small storm events satisfactorily, Miami officials wanted to ensure the pipes would continue to manage severe storm events, as well.
机译:当定期维护不能使比斯坎岛的雨水管道系统保持完整功能时,迈阿密资本改善和运输计划办公室安排了玻璃化粘土和混凝土管的更换。尽管该系统仍可以令人满意地处理大多数小型风暴事件,但迈阿密官员希望确保管道也能继续处理严重的风暴事件。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号