The Belo Monte Dam Case

机译:贝洛蒙特大坝案

获取原文
获取原文并翻译 | 示例
           

摘要

The Brazilian Institute of Environment and Renewable Natural Resources (Institute Brasileiro do MeioAmbiente e dos Recursos Naturais Renovdveis - IB AMA) approved the partial construction licence needed to start the construction of the Belo Monte damcomplex near Altamira, in the heart of the state of Para and the Amazon rain forest. This licence, the last legal step needed to start construction, was granted despite the fact that the project did not comply with the legal, environmental and social conditions required by Brazil's environmental legislation, and only after the resignation of the agency's director, Abelardo Bayma Azevedo.
机译:巴西环境与可再生自然资源研究所(IB AMA IB巴西环境与可再生自然研究所-IB AMA)批准了在帕拉州和帕拉州州中心阿尔塔米拉附近开始贝洛蒙特水坝综合体建设所需的部分建设许可证。亚马逊雨林。尽管该项目不符合巴西环境立法所要求的法律,环境和社会条件,但仅在该机构负责人Abelardo Bayma Azevedo辞职后,才授予该许可证,这是开始施工所需的最后法律步骤。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号