...
首页> 外文期刊>Environmental Practice >A Method for Preparing for and Executing Conflict of Interest Assessments
【24h】

A Method for Preparing for and Executing Conflict of Interest Assessments

机译:利益冲突评估的准备和执行方法

获取原文
获取原文并翻译 | 示例

摘要

National Environmental Policy Act (NEPA) regulations stipulate that when an agency opts to have a private contractor prepare an environmental impact statement, contractor selection should be conducted in such a way as to avoid conflicts of interest (COIs) that might adversely affect the integrity of the NEPA process. The goal is to ensure an unbiased, credible, and defensible environmental impact statement that supports public and transparent decision making. The contractor is responsible for executing a COI disclosure statement prepared by the agency, stating that the contractor has "no financial or other interest" in the outcome of the project. Because determining freedom from COIs after the fact may be difficult, private NEPA contractors should proactively collect information that supports a broad COI analysis of all aspects of their business models, taking into consideration requirements from other regulations that may govern a specific contractor/agency relationship.
机译:国家环境政策法(NEPA)法规规定,当机构选择让私人承包商准备环境影响声明时,承包商的选择应避免产生可能对项目完整性造成不利影响的利益冲突(COI)。 NEPA流程。目的是确保无偏见,可信且可辩护的环境影响声明能够支持公开透明的决策。承包商负责执行由机构准备的COI披露声明,声明承包商对项目结果“无财务利益或其他利益”。由于事后很难确定是否需要COI,因此,NEPA私营承包商应积极收集信息,以支持对其业务模式各个方面进行广泛的COI分析,同时要考虑到可能管理特定承包商/代理机构关系的其他法规的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号