首页> 外文期刊>Engineering Geology >Principal engineering geological problems in the Shisanling Pumped Storage Power Station, China
【24h】

Principal engineering geological problems in the Shisanling Pumped Storage Power Station, China

机译:中国十三陵抽水蓄能电站的主要工程地质问题

获取原文
获取原文并翻译 | 示例
       

摘要

The Shisanling Pumped Storage Power Station is the first of this kind in China. The geological conditions thereat are complex. There are four principal engineering geological problems that are related to the project: site selection of the underground powerhouse, leakage in the lower reservoir, collapse in the penstock tunnel, and stability of the ^west slope of the upper reservoir. In this paper, these problems and relevant counter measures are briefly introduced
机译:十三陵抽水蓄能电站是中国首个此类电站。那里的地质条件很复杂。与该项目有关的四个主要工程地质问题是:地下厂房的选址,下部水库的渗漏,压力管道隧道的坍塌以及上部水库的西坡的稳定性。本文简要介绍了这些问题及相关对策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号