Karst geology and engineering treatment in the Geheyan Project on the Qingjiang River, China

机译:中国清江隔河岩工程岩溶地质与工程处理。

获取原文
获取原文并翻译 | 示例
       

摘要

The Geheyan Hydropower Project is located in a highly karstified limestone area. The Shilongdong limestone of the foundation bedrock is strongly karstified. Over 600 karst caves of different sizes were discovered in the project area, with a total volume of more than 60,000 m~3. Faults parallel to the river are quite developed and karstification is intensified along the faults and their intersections. Exploration adits following the fault zones show a linear karstification ratio of 50 percent. Therefore, the potential karst leakage under the dam foundation and around both dam abutments is potentially problematic. Thanks to a proper investigation program and a large amount of geological investigations and analysis the karst conditions and major karst zones in the dam site had been identified before the construction commenced. Accordingly, the optimum grouting route was chosen and appropriate seepage control measures were adopted. During the construction, the pre-construction investigation results were well confirmed. Up to now, the project has been in good operation for nine years and the engineering treatment are proved to be very effective.
机译:隔河岩水电项目位于一个高度喀斯特石灰岩地区。基岩的石龙洞石灰岩强烈喀斯特。项目区发现了600多个大小不等的喀斯特洞穴,总规模超过60,000 m〜3。与河流平行的断层相当发达,沿断层及其交汇处的岩溶作用加剧。断层带后的勘探平地线显示了50%的线性岩溶化率。因此,大坝基础下和两个大坝基台周围潜在的岩溶渗漏是潜在的问题。得益于适当的调查计划和大量的地质调查与分析,在施工开始之前就已经确定了坝址的岩溶条件和主要岩溶区。因此,选择了最佳的灌浆路线,并采取了适当的防渗措施。在施工过程中,施工前的调查结果得到了很好的证实。到目前为止,该项目已经运行了九年,事实证明,工程处理是非常有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号