Partial collapses experienced for a steel space truss roof structure induced by ice ponds

机译:冰池引起的钢结构桁架屋顶结构局部塌陷

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents investigations on the steel space truss roof of an industrial plant collapsed partially after exceptional snowfalls. This low sloped light weight roof structure supported on steel columns of 16.3 m height and covering totally 26,080 m(2) closed area in plan was constructed as Mero type double layer grid steel space truss system having a height of 2 m. Also, parapets of 90 cm height were placed along the perimeter of the building and siphonic system was used for roof drainage. To find out the main reasons of the partial collapse of the roof structure, a site investigation was conducted and findings were collected, then conformity of the structural members were checked with respect to the current Turkish steel building design codes. The material properties of the primary load carrying members of the roof were scrutinized by performing tensile tests. Finally, it was understood that two unexpected catastrophic collapses were experienced as a consequence of ice ponds that occurred on the edge regions of the roof due to discontinuously heated roof parts by the radiant heaters mounted on the roof structure and the freezing of the siphonic system. (C) 2015 Elsevier Ltd. All rights reserved.
机译:本文介绍了对某工厂的钢制空间桁架屋顶的调查,该屋顶在特大降雪后部分倒塌。这种低倾斜轻质屋顶结构,支撑在16.3 m高的钢柱上,平面图上总共覆盖了26,080 m(2)封闭区域,构造为高度为2 m的Mero型双层网格钢制空间桁架系统。此外,沿着建筑物的四周放置了90厘米高的护墙,虹吸系统用于屋顶排水。为了找出屋顶结构部分倒塌的主要原因,我们进行了现场调查并收集了调查结果,然后根据当前的土耳其钢结构建筑设计规范检查了结构构件的合格性。通过进行拉伸试验来检查屋顶的主要承载构件的材料性能。最后,可以理解的是,由于安装在屋顶结构上的辐射加热器对屋顶部分进行了不连续加热以及虹吸系统的冻结,在屋顶边缘区域发生了冰塘,结果发生了两次意外的灾难性倒塌。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号