首页> 外文期刊>Engineering failure analysis >Analysis of critical field procedures for power HV overhead transmission line splices installed after restructuring of Brazilian electrical sector
【24h】

Analysis of critical field procedures for power HV overhead transmission line splices installed after restructuring of Brazilian electrical sector

机译:分析巴西电气部门重组后安装的电力高压架空输电线路接头的关键现场程序

获取原文
获取原文并翻译 | 示例
           

摘要

The electricity transmission system lines in the Brazilian re-structured market is the subject on this work. Also are studied transmission lines field procedures considering economy and reliability of ACSR (Aluminum Core Steel Reinforced) cables and compression splices. The work describes compression splices field surveys with suppliers and users concessionaires and also suggest some procedures and inspections routines to improve system reliability.
机译:巴西重组市场中的输电系统线路是这项工作的主题。还研究了考虑ACSR(铝芯钢增强)电缆和压缩接头的经济性和可靠性的传输线现场程序。该工作描述了与供应商和用户特许经营者的压接接头现场调查,并提出了一些程序和检查例程以提高系统可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号