首页> 外文期刊>Iron & Steel Technology >Alternating Taphole Practice With a Tow-taphole Blast Furnace
【24h】

Alternating Taphole Practice With a Tow-taphole Blast Furnace

机译:拖式高炉交替进行的出铁口实践

获取原文
获取原文并翻译 | 示例
       

摘要

To maximize the asset value of Dofasco's No. 4 blast furnace, the focus has been on leveraging people, operating excellence and technology. This strategy has proved to be very successful in operating at high production levels of 4,850-5,000 nthm/day with two tapholes. The developments in preventive maintenance and operating practices have led to increased taphole reliability, thus optimizing two-sided casting. To meet a long-term initiative of a 20-year campaign and eliminate or defer taphole repairs, further improvements are being made. These include the mudgun and drills, taphole maintenance, day-to-day operation and development of long-term strategies.
机译:为了使Dofasco的4号高炉的资产价值最大化,重点一直放在利用人员,卓越运营和技术上。实践证明,该策略在以两个出铁口达到4,850-5,000 nthm / day的高产量水平下运行非常成功。预防性维护和操作方法的发展已提高了出铁孔的可靠性,从而优化了双面铸造。为了满足20年运动的长期计划并消除或推迟对出铁孔的维修,正在做进一步的改进。这些包括泥浆枪和钻机,出铁孔维护,日常操作以及制定长期策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号