首页> 外文期刊>Iron & Steelmaker >Cannon Balls to Consteel: Ameristeel - Knoxville's Melt Shop Modernization
【24h】

Cannon Balls to Consteel: Ameristeel - Knoxville's Melt Shop Modernization

机译:炮弹到Consteel:Ameristeel-诺克斯维尔的熔炼车间现代化

获取原文
获取原文并翻译 | 示例
       

摘要

The successful engineering, design, construction and startup of the Knoxville melt shop project continues to be a source of pride and achievement within AmeriSteel.The successful engineering, design, construction and startup of the new Knoxville melt shop project, now more than 1-year-old, continues to be a source of pride and achievement within AmeriSteel. The decisions to be our own contractor, separate the construction into bid packages and handle a large portion of equipment procurement in house have proven sound. Without these decisions, our aggressive construction and commissioning schedule would have been extremely difficult to meet, given our budget constraints. Additionally, the time and money invested in training was returned virtually immediately upon commissioning of the new melt shop.
机译:诺克斯维尔熔体车间项目的成功工程,设计,建造和启动继续是AmeriSteel的骄傲和成就,而新的诺克斯维尔熔体车间项目的成功工程,设计,建造和启动现已超过1年岁,仍然是AmeriSteel的骄傲和成就的来源。事实证明,成为我们自己的承包商,将施工分成招标文件并处理内部大量设备采购的决定是合理的。如果没有这些决定,考虑到我们的预算限制,我们激进的建设和调试时间表将非常难以实现。此外,新熔炼车间投入使用后,几乎立即就返还了用于培训的时间和金钱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号