...
首页> 外文期刊>Iron & Steel Review >Tap Hole Slide Gate for Slag Free Tapping at FACOR
【24h】

Tap Hole Slide Gate for Slag Free Tapping at FACOR

机译:龙头孔滑门,可在FAVOR处自由排渣

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

It is widely acknowledged today that I Slag Free Tapping to prevent carry over of slag from primary melting unit to the ladles has become a pre-requisite for meeting the stringent demands of secondary steelmaking. Slag free tapping helps in achieving improved control over refining operations and productivity. More importantly it substantially cuts down steelmaking cost and obviously improves quality of the steel produced. Ferro Alloys Corporation at Nagpur having a 20 M/T EAF decided to install the Flogates Model 2215 Furnace Gate Valve on their furnace. The operational improvements resulting from the installation have reduced the average cost per tonne melted substantially. FACOR expects to recover the investment cost in just under 4 to 6 months.
机译:如今,众所周知,为了防止二次炼钢的严格要求,防止炉渣从一次熔化单元转移到钢包的过程已成为一项先决条件。无渣出钢有助于改善对精炼操作和生产率的控制。更重要的是,它大大降低了炼钢成本,并明显提高了所生产钢材的质量。位于那格浦尔的Ferro合金公司的电炉为20 M / T,决定在其熔炉上安装Flogates 2215型炉闸阀。安装带来的运行改进已大大降低了每吨熔化的平均成本。 FACOR预计将在不到4至6个月的时间内收回投资成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号