首页> 外文期刊>Engineering & Mining Journal >Fortescue Sees Solomon Hub at Capacity by Year-end
【24h】

Fortescue Sees Solomon Hub at Capacity by Year-end

机译:Fortescue看到所罗门枢纽的产能到年底

获取原文
获取原文并翻译 | 示例
       

摘要

Fortescue Metals expects to have the two iron ore mines, Firetail and Kings, at its Solomon Hub in Western Australia operating at combined design capacity of 60 million metric tons per year (mt/y) of iron ore by year-end 2013. The mines are separated by a distance of 5 km. Associated infrastructure includes two ore processing facilities, crushing hubs, 15 km of overland conveyors, and a stockyard and train load-out facility. Fortescue formally opened the 20 million mt/y Firetail mine in early May. In late June, the company announced that it had awarded the mining contract for the Kings deposit to Leighton Contractors, with expectations that the mine would reach its design capacity of 40 million mt/y by year-end 2013.
机译:Fortescue Metals预计将在其位于西澳大利亚州所罗门枢纽的两个铁矿石矿场Firetail和Kings运营,到2013年底,铁矿的综合设计能力为每年6000万吨铁矿石。相距5公里。相关的基础设施包括两个矿石处理设施,破碎中心,15公里的陆上输送机以及一个堆场和火车卸货设施。 Fortescue于5月初正式开放了年产2000万吨的Firetail矿。 6月下旬,该公司宣布已将其Kings矿山的采矿合同授予了Leighton Contractors,期望该矿山到2013年底能达到4000万吨/年的设计能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号