...
首页> 外文期刊>Engineering & Mining Journal >High-pressure Couplings Solve Deep Mining Challenges at Resolution Project
【24h】

High-pressure Couplings Solve Deep Mining Challenges at Resolution Project

机译:高压联轴器解决了解决方案项目中的深层开采难题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As mines reach increasingly greater depths, piping water to and from the surface becomes ever more challenging. Mining contractor Cementation faced this obstacle when designing a chilled water line for the Resolution Project, located in the historic Pioneer Mining District just east of Superior, Arizona. With plans to sink exploratory shafts to 7,000 ft, Resolution Copper Mining needed a pipe-joining solution capable of handling the immense head and end loads, while offering flexibility to accommodate expansion and contraction. Victaulic provided a solution that met these specifications, and also reduced installation time and total installed costs.
机译:随着地雷的深度越来越大,将水运到地表和从地表运出的难度越来越大。采矿承包商Cementation在为解决方案项目设计冷冻水管线时遇到了这个障碍,该管线位于亚利桑那州苏必利尔以东的历史悠久的先锋矿区。由于计划将探井下沉到7,000英尺,Resolution Copper Mining需要一种能够解决巨大头端载荷的管道连接解决方​​案,同时提供适应伸缩的灵活性。唯特利提供了满足这些规格的解决方案,并减少了安装时间和总安装成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号