首页> 外文期刊>Engineering & Mining Journal >Gold Fields Extending South Deep Ventilation Shaft
【24h】

Gold Fields Extending South Deep Ventilation Shaft

机译:金矿田延伸南深通风井

获取原文
获取原文并翻译 | 示例
           

摘要

Gold Fields reported on April 21, 2010, it has started the depth extension of the South Deep Ventilation Shaft, a crucial milestone in the development of its South Deep mining complex in South Africa. The ventilation shaft is the second of the two shafts that together form the Twin Shaft complex at South Deep. The first shaft, the Main Shaft, was completed in 2004. The ventilation shaft will be extended from its current depth of 2,760 m to 3,000 m. The deepening and equipping of the shaft, which includes ore storage silos and conveyor belts at shaft bottom, a new rock winder, and new headgear, is set to be completed by July 2012.
机译:Gold Fields于2010年4月21日报道,该公司已开始扩大南部深部通风井的深度,这是南非南部深部采矿综合体发展的关键里程碑。通风竖井是两个竖井中的第二竖井,它们共同构成了South Deep的Twin Shaft建筑群。第一个竖井,即主轴,于2004年完工。通风竖井将从目前的深度2760 m扩展到3,000 m。竖井的加深和装备包括到竖井底部的矿石储料仓和传送带,新的绕石机和新的头盔,定于2012年7月完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号