首页> 外文期刊>Energy Source & Distribution >Power supplies for mining projects
【24h】

Power supplies for mining projects

机译:采矿项目电源

获取原文
获取原文并翻译 | 示例
           

摘要

ETSA Utilities will provide fit-for-purpose connections specifically for the environment and expected life of the deposits being mined. Network connections can be arranged at any voltage and 'build-own-operate' (BOO) arrangements are available for connections up to, and including, 132kV. As an example, ETSA Utilities recently began constructing a new transmission line for OneSteel at Whyalla in South Australia for the expansion of the company's Iron Duke Mine. ETSA Utilities will provide a 132kV substation and 12km line connection into the existing Electranet transmission network.
机译:ETSA公用事业公司将提供专门针对环境和所开采矿床的预期寿命的连接。网络连接可以在任何电压下进行布置,“内部拥有-操作”(BOO)布置可用于最高132kV(包括132kV)的连接。例如,ETSA公用事业公司最近开始在南澳大利亚的Whyalla为OneSteel建设一条新的输电线路,以扩展该公司的Iron Duke矿山。 ETSA公用事业公司将为现有的Electranet传输网络提供132kV变电站和12公里的线路连接。

著录项

  • 来源
    《Energy Source & Distribution》 |2006年第mayajuna期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号