【24h】

BEYOND THE RANGE

机译:超越范围

获取原文
获取原文并翻译 | 示例
           

摘要

For early settlers attempting to explore Queensland's Darling Downs, the Toowoomba range proved a barrier for horse-drawn carts looking to travel west. One-hundred-and-seventy years later the Great Dividing Range continues to test the pioneering spirit, proving a logistical and safety challenge for transportation of the generators and turbines intended for the region's newest power station. Situated near the Braemar site in the Darling Downs region and near completion, the gas-fired power station has an approximate 630 MW base load plant capacity from three 120 MW Frame 9E gas turbines and a 270 MW steam turbine. Construction began in August 2007 and was headed by Origin project director, Paul Farnworth. The new power station will take advantage of CSG reserves held by Australia Pacific LNG (APLNG) and Origin in south west Queensland, predominantly in the area around Roma and Chinchilla.
机译:对于试图探索昆士兰州达令唐斯山脉的早期定居者而言,图文巴山脉被证明是希望向西部旅行的马车的障碍。一百零七年后,大分水岭继续测试开拓精神,证明了该地区最新电站所用发电机和涡轮的运输在物流和安全方面面临的挑战。该燃气发电站位于达令唐斯地区的Braemar基地附近,即将完工,具有3台120 MW Frame 9E燃气轮机和270 MW蒸汽轮机的大约630 MW基本负荷电厂容量。建设始于2007年8月,由Origin项目总监Paul Farnworth领导。新电站将利用澳大利亚太平洋液化天然气公司(APLNG)和Origin在昆士兰州西南部(主要在罗姆人和龙猫周围的地区)拥有的南玻集团储量。

著录项

  • 来源
    《Energy Source & Distribution》 |2010年第maraaapra期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号