...
首页> 外文期刊>Energy Source & Distribution >Peter Brotherhood secures a second contract in Pakistan
【24h】

Peter Brotherhood secures a second contract in Pakistan

机译:彼得兄弟会在巴基斯坦获得第二份合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Peter Brotherhood, which is celebrating 140 years in business this year and 100 years of designing and manufacturing steam turbines, will produce the 2.5 million pounds steam turbine and deliver it to the power station in September 2008. The turbine will be driven by steam generated from the waste heat contained in the exhaust gases emitted from 11 generator sets based on MAN Diesel 18 cylinder vee configuration type 18V 48/60B four-stroke medium speed engines. The steam turbine and gearbox will be mounted on a combined bedplate which will incorporate an electronic governor, a PLC-based control and monitoring system and an air cooled generator.
机译:彼得·兄弟会(Peter Brotherhood)今年将庆祝其成立140周年,并设计和制造蒸汽轮机100周年,它将生产250万磅的蒸汽轮机,并将于2008年9月交付至发电站。基于MAN Diesel 18缸V型配置18V 48 / 60B四冲程中速发动机的11台发电机组排放的废气中包含的废热。蒸汽轮机和变速箱将安装在组合的底板上,该底板将包括电子调速器,基于PLC的控制和监视系统以及风冷发电机。

著录项

  • 来源
    《Energy Source & Distribution》 |2007年第novaadeca期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号