首页> 外文期刊>Energy Source & Distribution >MILESTONE FOR SOUTH AFRICAN HYDROPOWER PROJECT
【24h】

MILESTONE FOR SOUTH AFRICAN HYDROPOWER PROJECT

机译:南非水电项目的里程碑

获取原文
获取原文并翻译 | 示例
           

摘要

Tasmanian government-owned electricity generator Hydro Tasmania has announced its Neusberg project in South Africa has achieved full scale commercial operation. The Neusberg project is a run-of-river small hydropower project on the Orange River near Kakamas in the Northern Cape of South Africa. It is the first run-of-river hydropower scheme developed under the Republic of South Africa's Renewable Energy Independent Power Producer's Programme (REIPPP) and will deliver 10MW of baseload power in the South African energy market, enough electricity for about 5000 households.
机译:塔斯马尼亚州政府拥有的发电机塔斯马尼亚水电公司宣布,其在南非的Neusberg项目已实现全面商业运营。诺伊斯贝格(Neusberg)项目是位于南非北开普省卡卡马斯(Kakamas)附近奥兰治河(Orange River)上的小河水上游项目。这是南非共和国可再生能源独立发电商计划(REIPPP)下开发的第一个河流上游水电计划,将在南非能源市场提供10MW的基本负荷电力,足以为约5000户家庭供电。

著录项

  • 来源
    《Energy Source & Distribution》 |2015年第4期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号