Mechanical pole testing case study

机译:机械杆测试案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

In the absence of a reliable acceptable system of testing poles, many utilities over-condemn poles 'just to be on the safe side'. Old poles are systematically replaced or reinforced. This method can be unnecessarily wasteful as often old but sound poles are rejected. Currently, most utilities use the 'sound dig and drill' method of testing their power poles. In trials it has been shown that this method often condemns over 50 per cent of still sound poles. It also misses many weak poles. The basic problem with it is that it is subjective. The assessment of poles is very much dependent on the experience of the operator. Different operators invariably come up with different results.
机译:在没有可靠的可接受的测试杆系统的情况下,许多公用事业公司过分地指责杆“只是为了安全起见”。旧杆将被系统地更换或加固。该方法可能不必要地浪费,因为通常会很旧,但会拒绝使用音柱。当前,大多数公用事业公司使用“声音挖掘和钻孔”方法来测试其电线杆。在试验中表明,这种方法经常谴责超过50%的静杆。它还错过了许多薄弱环节。它的基本问题是它是主观的。极点的评估在很大程度上取决于操作员的经验。不同的运算符总是会得出不同的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号