【24h】

SWIFT TO ACT

机译:快速行动

获取原文
获取原文并翻译 | 示例
           

摘要

Following a dry autumn, Perth's suburbs and outlying wheat belt were hit by a steady rain in mid-June, providing the region a much-needed drench. With just one month to go before final project completion, the rain wasn't as welcome at Western Australia's 120 MW Kwinana Swift, but Perth Energy's wholesale general manager and project director, Patrick Peake, couldn't complain. "One part of our success has been the incredible dry time we've had in Perth, which has been really positive (for construction)," Mr Peake explained to Energy Source ft Distribution from his Perth office.
机译:在干燥的秋季之后,珀斯的郊区和外围的小麦带在6月中旬受到持续降雨的袭击,为该地区提供了急需的雨水。距离最终项目完成只有一个月的时间,西澳大利亚州的120兆瓦Kwinana Swift雨水并不受欢迎,但是珀斯能源公司的批发总经理兼项目总监帕特里克·皮克(Patrick Peake)对此没什么抱怨。皮克先生在珀斯办公室的Energy Source ft Distribution解释说:“我们成功的一部分是我们在珀斯拥有令人难以置信的干燥时间,这对建筑业来说确实是积极的。”

著录项

  • 来源
    《Energy Source & Distribution》 |2010年第julaauga期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号