The Wartsila GasCube

机译:瓦锡兰GasCube

获取原文
获取原文并翻译 | 示例
           

摘要

The Wartsila GasCube, manages to provide users with a pre-engineered power plant within a competitive cost framework, improving the Life Cycle Cost and Internal Rate of Return of such a project. Undertaking turnkey delivery of small power plants based on just a few engines is usually not an economically viable option for industrial customers or small independent power producers (IPP's). This is because turnkey project execution for a small power plant is often as labour intensive as the turnkey delivery of a much larger plant. The reason for this is that the required project-specific design, engineering and project management has a higher impact on the overall specific cost of a small project. Furthermore, the economics of scale do not act in favour of small "one-off" projects, either in producing equipment, or in site works.
机译:Wartsila GasCube设法在具有竞争力的成本框架内为用户提供预先设计的发电厂,从而改善了此类项目的生命周期成本和内部收益率。对于工业客户或小型独立发电商(IPP's)而言,仅基于几个发动机的小型发电厂的交钥匙交付通常不是经济上可行的选择。这是因为小型电厂的总承包项目执行通常与大型电厂的总承包交付一样劳动密集型。原因是所需的特定于项目的设计,工程和项目管理对小型项目的整体特定成本有较大的影响。此外,规模经济在生产设备或现场工作中都不利于小型的“一次性”项目。

著录项

  • 来源
    《Energy Source & Distribution》 |2009年第janaafeba期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号