首页> 外文期刊>Energy Source & Distribution >30Million dollars + boost to power Gold Coast desalination plant
【24h】

30Million dollars + boost to power Gold Coast desalination plant

机译:3000万美元+为黄金海岸海水淡化厂提供动力

获取原文
获取原文并翻译 | 示例
           

摘要

The upgrades will also provide improved electricity reliability and capacity for more than 20,000 homes and businesses on the southern end of the Gold Coast. Early next month work will begin on stage one of the two-stage process of installing underground double circuit 33,000 volt power cables between Energex's Burleigh substation in Kortum Drive and the Gold Coast desalination plant at Tugun. Associated works in the coming 18 months include the expansion of Energex's substation at Currumbin and upgrades at the existing Burleigh and Palm Beach substations.
机译:升级还将为黄金海岸南端的20,000多个家庭和企业提高电力可靠性和容量。下个月初的工作将在两阶段过程中的第一阶段开始,该阶段是在Energex的Kortum Drive的Burleigh变电站和Tugun的黄金海岸海水淡化厂之间安装地下双回路33,000伏电力电缆的过程。未来18个月的相关工作包括Energex在Currumbin变电站的扩建以及现有Burleigh和Palm Beach变电站的升级。

著录项

  • 来源
    《Energy Source & Distribution》 |2007年第mayajuna期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号