【24h】

ROLL OUT

机译:推出

获取原文
获取原文并翻译 | 示例
           

摘要

Victoria is the first state in Australia to give the go-ahead for the wide spread roll out of smart meters. Starting in September last year, the roll out of smart meters is the biggest infrastructure update for the Victorian energy sector since the poles and wires network was installed. Smart meters are being rolled out to residential and small/medium business electricity consumers (using less than 160 MW h per annum), with more than 20,000 smart meters installed to date. The roll out is part of a larger infrastructure program - the Victorian Government's 'Smart Infrastructure Program', which forms the building block for the state's future functionality.
机译:维多利亚州是澳大利亚第一个为智能电表的广泛普及而批准的州。自去年9月开始,自从电线杆和电线网络安装以来,智能电表的推出是维多利亚州能源行业最大的基础设施更新。智能电表正在向居民和中小型企业用电者推广(每年使用少于160兆瓦时),迄今为止已安装了20,000多个智能电表。此次推出是更大的基础设施计划的一部分-维多利亚州政府的“智能基础设施计划”,该计划构成了该州未来功能的基础。

著录项

  • 来源
    《Energy Source & Distribution》 |2010年第janaafeba期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号