...
【24h】

The tender trap

机译:温柔的陷阱

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Counting and measuring are central to accurate estimating, but there's much more to it. Brian Seymour outlines the detail. In the world of competitive tendering, the profitability or otherwise of the project depends on the skill of the estimator, or the estimating team. Competitive tendering cannot be reduced to a 'price per point' process, in which everyone is aiming for a price that is a fabrication cultivated by developers looking for the cheapest option. As a teacher of electrotechnology estimating for many years, I was surprised to hear an ex-student remark that the estimating process hasn't changed in the past couple of decades. If you are a 'count and measure' clerk, that may be so. Whether you use a manual or electronic system, all the accessories have to be counted and all installation materials have to be measured. None of that is rocket science.
机译:计数和测量是准确估算的核心,但还有很多。 Brian Seymour概述了细节。在竞争性招标的世界中,项目的盈利能力或其他方式取决于估算者或估算团队的技能。竞争性招标不能简化为“每点价格”过程,在此过程中,每个人都将目标价格定为寻找最便宜选择的开发商所捏造的价格。作为多年的电子技术评估老师,我很惊讶地听到一位前学生说评估过程在过去的几十年中没有发生变化。如果您是“计票”服务员,那就可能是这样。无论您使用手动还是电子系统,都必须对所有附件进行计数,并且必须对所有安装材料进行测量。这些都不是火箭科学。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号