...
首页> 外文期刊>Earth Surface Processes and Landforms: The journal of the British Geomorphological Research Group >Effect of reservoir construction on suspended sediment load in a large river system: Thresholds and complex response
【24h】

Effect of reservoir construction on suspended sediment load in a large river system: Thresholds and complex response

机译:水库建设对大型河流系统中悬浮泥沙负荷的影响:阈值和复杂响应

获取原文
获取原文并翻译 | 示例

摘要

Dam construction greatly alters the channel boundary of rivers, making the dammed river system a human-controlled system. Based on hydrometric data in the upper Changjiang River basin, the change in behaviour of sediment transport of some dammed rivers was studied. As a result, some phenomena of threshold and complex response were found. When the coefficient (C_(r,a)) of actual runoff regulation by reservoirs, defined as the ratio of total capacity of reservoirs to annual runoff input, is smaller than 10%, suspended sediment load at Yichang station, the control station of the Changjiang River, shows a mild decreasing trend. When this coefficient becomes larger than 10%, suspended sediment load decreases sharply. The coefficient of 10% can be regarded as a threshold. The C_(r,a) of 10% is also a threshold, when the variation of suspended sediment concentration (SSC) with C_(r,a) at Yichang station is considered. The impacts of reservoir construction can be divided into several stages, including road construction, dam building and closure, water storage and sediment trapping. During these stages, some complex response was identified. At the station below the dam, SSC increases and reaches a maximum, and then declines sharply. This phenomenon was found on the main-stem and several major tributaries of the upper Changjiang River. In the Minjiang River, where a series of dams were built successively, the response of SSC is more complicated.
机译:大坝的建设大大改变了河流的河道边界,使筑坝的河流系统成为人为控制的系统。基于长江上游流域的水文数据,研究了一些大坝河流的泥沙输移行为。结果,发现了一些阈值现象和复杂响应。当水库实际径流调节系数(C_(r,a))定义为水库总容量与年径流量输入之比小于10%时,宜昌站,控制站的悬浮泥沙负荷长江流域呈缓和趋势。当该系数大于10%时,悬浮泥沙负荷急剧下降。 10%的系数可以视为阈值。当考虑宜昌站的悬浮泥沙浓度(SSC)随C_(r,a)的变化时,C_(r,a)为10%也是一个阈值。水库建设的影响可以分为几个阶段,包括道路建设,大坝的建造和关闭,蓄水和泥沙淤积。在这些阶段中,确定了一些复杂的响应。在水坝下方的车站,SSC增大并达到最大值,然后急剧下降。这种现象在长江上游的干流和几个主要支流中发现。在相继修建了一系列水坝的the江,南南合作的响应更加复杂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号