首页> 外文期刊>Ecology, Environment and Conservation >Simulation of Gheshlagh dam construction effect on the Gheshlagh aquifer using MODFLOW
【24h】

Simulation of Gheshlagh dam construction effect on the Gheshlagh aquifer using MODFLOW

机译:用MODFLOW模拟Gheshlagh大坝对Gheshlagh含水层的施工效果。

获取原文
获取原文并翻译 | 示例
       

摘要

In this research, quantitative simulation of Gheshlaghaquifer is conducted using Visual Modflow in order to investigate the effect of Gheshlagh Dam construction on the aquifer. First, required data was collected from related organizations and processed to be importable to the program. The first step of modeling is extracting terrain data from CIS maps and then importiiig the required packages of the program. This simulation was performed into two stages iiicluding quantitative simulation of the aquifer without applying the dam and simulation of the aquifer with applying the dam and finally extracting the drawdown graphs for two stages. After extracting and comparison of the graphs, it is concluded that Gheshlagh Dam is acting as an artificial recharge source and the water table level in presence of the dam has a better situation than without the dam. However, the aquifer water budget in both conditions is estimated negative and proper decisions for long term operation from the aquifer should be considered.
机译:在这项研究中,使用Visual Modflow进行了Gheshlaghaquifer的定量模拟,以研究Gheshlagh大坝建设对含水层的影响。首先,从相关组织收集了所需的数据,并将其处理为可导入程序的数据。建模的第一步是从CIS地图中提取地形数据,然后导入所需的程序包。该模拟分为两个阶段,包括不应用坝的含水层的定量模拟和应用坝的含水层的模拟,最后提取两个阶段的水位下降图。通过提取和比较图表,可以得出结论,Gheshlagh大坝是人工补给源,存在大坝的地下水位比没有大坝的情况要好。但是,两种情况下的含水层水预算估计为负值,应考虑含水层长期运行的适当决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号