首页> 外文期刊>IPS News Bulletin-Iron & Steel Industry >RINL expansion: work on sinter plant-3 begins
【24h】

RINL expansion: work on sinter plant-3 begins

机译:RINL扩建:烧结厂3的工作开始

获取原文
获取原文并翻译 | 示例
       

摘要

The construction work on sinter plant-3, taken up as part of the Visakhapatnam Steel Plant expansion project, began on Wednesday. Mr Y. Sivasagara Rao, Chairman and Managing Director, said that it was the first of the turnkey projects in the expansion project. It has been awarded to McNally Bharat Engineering Company, Kolkata and Tyazhprom export (Russia). The total cost of the project is Rs 687 crore; the project is to be commissioned in 28 months.
机译:作为维萨卡帕特南钢铁厂扩建项目的一部分,烧结厂3的建设工作于周三开始。董事长兼董事总经理Y. Sivasagara Rao先生说,这是扩建项目中的第一个交钥匙项目。它已被授予McNally Bharat工程公司,加尔各答和Tyazhprom出口(俄罗斯)。该项目的总成本为68.7亿卢比;该项目将在28个月内投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号