首页> 外文期刊>Ecological restoration >Inadequate Monitoring and Inappropriate Project Goals: A Case Study on the Determination of Success for the Forester Creek Improvement Project
【24h】

Inadequate Monitoring and Inappropriate Project Goals: A Case Study on the Determination of Success for the Forester Creek Improvement Project

机译:监测不足和项目目标不当:以确定Forester Creek改造项目成功与否为例

获取原文
获取原文并翻译 | 示例
       

摘要

In 2008 the "Forester Creek Improvement Project" was completed near the mouth of Forester Creek, Santee, CA, along a 2-km section historically subject to flooding. With a cost of $36 million (US), the project's goals were to: 1) improve water quality; 2) improve physical habitat and biodiversity; and 3) improve flood control. We evaluated if the project met these goals for water quality, physical habitat, and biodiversity. We evaluated the project's monitoring data, conducted post- project monitoring, and analyzed data from other independent sources to assess goal attainment. The project's required monitoring was insufficient to determine if any goals were met. Our own results found partial success, with only pH and water temperatures improved from pre-project conditions. No improvement was found for total dissolved solids or fecal coliform, for which the creek is impaired, and sediments contained toxic concentrations of urban-use pesticides. While the project's monitoring was insufficient to document goal attainment, the project's formal goals were largely infeasible due to degraded upstream conditions. The project should be considered a partial success in that riparian habitat has improved compared to the erosive and invasive species dominated pre-project condition and the original proposal by the City of Santee to line the creek with concrete. Forester Creek's poor water quality, physical habitat, and biodiversity are driven by flow modification and pollution associated with urban development upstream, which must be addressed at the watershed scale and outside of the stream channel.
机译:2008年,在加利福尼亚州Santee的Forester Creek河口附近,沿着历来遭受洪水袭击的2公里路段,完成了“ Forester Creek改善项目”。该项目的目标是花费3600万美元,以:1)改善水质; 2)改善自然栖息地和生物多样性; 3)加强防洪工作。我们评估了该项目是否达到了水质,自然栖息地和生物多样性的目标。我们评估了项目的监控数据,进行了项目后的监控,并分析了来自其他独立来源的数据以评估目标的实现。该项目所需的监视不足以确定任何目标是否达到。我们自己的结果取得了部分成功,只有pH和水温比项目前的状况有所提高。对于小溪受损的总溶解固体或粪便大肠菌群,没有发现改善,沉积物中含有毒性浓度的城市用农药。尽管该项目的监控不足以记录目标的实现,但由于上游条件的恶化,该项目的正式目标在很大程度上是不可行的。该项目应被认为是部分成功的,因为与侵蚀性和入侵性物种占主导的项目前状况相比,河岸生境已经得到改善,而桑提市最初提出的使小河衬砌混凝土的提议被认为是成功的。 Forester Creek不良的水质,自然栖息地和生物多样性是由上游城市发展带来的流量变化和污染所驱动,必须在分水岭规模和河道外部加以解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号