Integrated constructed wetlands (ICWs) were implemented to reduce nutrient and sediment transport from a confined-animal dairy operation in East Tennessee. The objectives of this study were to (1) characterize first flush concentrations of potential pollutants from a typical confined animal dairy operation, and (2) determine if two ICWs have acted as hydrologic and physicochemical buffers in agricultural drainages during the establishment phase (first year after construction). Nine events between the two ICWs were sampled within the first year of construction and flow rates were continuously measured at the inlets and outlets. First flush sampling showed that phosphorus concentrations exceeded critical levels in six of the eight sampled events and nitrogen concentrations exceeded critical levels in half of the sampled events. Suspended solids, organic carbon, and phosphate were the most commonly detected pollutants of concern carried by runoff leaving the dairy operation. The documented performance of ICWs indicated that the practices generally reduced sediment and nutrient concentrations in runoff flowing to receiving waterways during wet weather conditions during the first year following construction and acted to buffer hydrologic pulses by reducing peak flow rates. In four sampled storm events spanning the time of late summer through winter, a total of over 2200 kg of suspended solids and 0.22 kg of nitrogen were retained in one ICW. Organic carbon was exported from the ICW practices during most events. Overall, the practice removed significant amounts of suspended solids and nitrogen, and event-based phosphorus. Published by Elsevier B.V.
机译:实施了综合人工湿地(ICWs),以减少东田纳西州密闭动物奶牛场中养分和沉积物的运输。这项研究的目的是(1)对典型的密闭动物奶牛场的潜在污染物的首次冲刷浓度进行表征,以及(2)确定在建立阶段(第一年)农业排水中是否有两个ICW充当了水文和物理化学缓冲剂施工后)。在建造的第一年内,对两个ICW之间的九个事件进行了采样,并在入口和出口处连续测量流量。首次冲洗采样表明,在八个采样事件中的六个采样事件中,磷浓度超过了临界水平,在一半采样事件中,氮浓度超过了临界水平。悬浮物,有机碳和磷酸盐是乳制品厂径流携带的最常见的污染物。记录在案的ICW的性能表明,这种做法通常在建造后的第一年内在潮湿天气条件下降低了流入接收水道的径流中的泥沙和养分浓度,并通过降低峰值流速来缓冲水文脉冲。在从夏末到冬季的四个采样风暴事件中,一台ICW中总共保留了2200千克以上的悬浮固体和0.22千克的氮气。在大多数活动中,有机碳是从ICW惯例中出口的。总体而言,该实践去除了大量的悬浮固体和氮以及基于事件的磷。由Elsevier B.V.发布

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号