首页> 外文期刊>E&P daily >UK Tristan development is go
【24h】

UK Tristan development is go

机译:英国Tristan的发展已成定局

获取原文
获取原文并翻译 | 示例
           

摘要

Granby Oil and Gas has kicked off development drilling on the Tristan NW gas field in the UK sector of the North Sea.The single subsea well is expected to take approximately 70 days to drill and complete as a horizontal production well.The development consists of a single subsea well with a control umbilical and 15km flowline which will deliver gas to the Davy platform.
机译:Granby油气公司已开始在北海英国部分的Tristan NW气田进行开发钻探,预计单个海底井将花费约70天的时间进行钻探并作为水平生产井完成。具有控制性脐带和15公里长输油管线的单个海底井,可将天然气输送到戴维平台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号